Drill through the stud to make a divot on the concrete.
Stud walls on concrete.
Be sure to wear safety goggles when hammering masonry nails into concrete.
Anchors for concrete install like a stud anchor just thread the anchor a nut and a washer onto the end of a threaded rod drive into a hole and turn the nut to expand the base.
Use a stud finder or tap on the ceiling and drive finishing nails into the sheathing to uncover hidden joists.
Also known as rod anchors they re often used with threaded rod to hang pipe and wiring.
Choose a length that will penetrate the concrete at least 1 inch.
Joists should run every 16 or 24 inches and may run perpendicular to the concrete.
You can add some 1 x 3 or even 1 x 2 studs attached directly to the concrete block and mount the drywall directly to them.
Step 1 stretch a tape measure across the concrete slab and mark the position of the wall s ends.
Use a hammer drill with 3 16 masonry bit to drill a hole through the wood and into the concrete floor.
Mark the location for the anchor centered on the two by four stud.
Insert a 3 8 inch masonry drill bit into a hammer drill.
Use an impact driver to drive a 3 tapcon screw through the wood and into the floor.
Secure the top plate to the joists above again two at a time wherever.
Cut pressure treated 2 x 4 boards to length and lay them along the chalk line.
With simple materials and readily available tools the novice carpenter can lay out build and anchor walls on concrete slabs.
Place the two by four in its desired location.
Superior walls precast concrete foundations are the best solution for residential builders looking for reliable scheduling efficient one day installation ready to finish convenience energy code performance and a manufacturer s limited warranty.
Walls are built from the ground up.
Tape a one foot by one foot square of plastic sheeting plastic kitchen wrap will do to the concrete wall in your basement with duct tape and leave it in place for 24 hours.
Because there s no insulation in between you ll need to waterproof your garage walls before you start.
Drive nails through the bottom plate into the concrete two at a time every 10 to 12 inches with a powder actuated nail gun.
Then remove the tape.